BTC / USD$79,978
DIFFICULTY127.45 T
NETWORK912 EH/s
REWARD3.125 BTC
OUR POWERfrom $0.072/kWh
S23 HYDRO563 TH/s · 9.5 J/TH
UPTIME SLA97.0%
GRID100% HYDRO
BTC / USD$79,978
DIFFICULTY127.45 T
NETWORK912 EH/s
REWARD3.125 BTC
OUR POWERfrom $0.072/kWh
S23 HYDRO563 TH/s · 9.5 J/TH
UPTIME SLA97.0%
GRID100% HYDRO

The founders

Acuario Hosting is run hands-on by its two founders, Filip Csaszar and Jaroslav Dzurilla, four years in Paraguay. Watch the video from the operation.

Two people. Both reachable.

You are about to send hardware worth six figures to a container on another continent. You should know exactly whose hands it lands in — and be able to get one of them on WhatsApp when something matters.

Filip Csaszar and Jaroslav Dzurilla, founders of Acuario Hosting
Filip CsaszarCo-founder
Jaroslav DzurillaCo-founder

Acuario Hosting is run by Filip Csaszar and Jaroslav Dzurilla. We founded it, and we still manage it day to day — there is no layer of account managers between you and the people responsible for your machines.

We have been building businesses in Paraguay for four years, and mining hosting is not the only one. That matters more than it sounds: we did not arrive with the last bull market and we are not planning to leave with the next drawdown. The container, the cooling plant and the security are ours to keep running.

We are Bitcoiners first. We mine Bitcoin, we hold Bitcoin, and we will tell you when we think the timing is wrong for you — including when that means not selling you anything this quarter.

4 years in Paraguay2 founders, both hands-onUS LLC working with a Paraguayan operatorReachable on WhatsApp
See it, don't take our word

Meet Acuario Hosting

One minute from the operation in Paraguay — the container, the machines, the people.

This is not a rendering.

Our Bitmain HK3 hydro container in Paraguay: the transformer we installed, the medium-voltage line we connected to, the racks inside. Photographed by us, on the day.

The HK3 container with its own transformer and switchgear, fed straight from the medium-voltage line.
The HK3 container with its own transformer and switchgear, fed straight from the medium-voltage line.
Inside: hydro racks, coolant manifolds and the control cabinet. Every machine on its own valve.
Inside: hydro racks, coolant manifolds and the control cabinet. Every machine on its own valve.
The grid crew tying the site into the medium-voltage line.
The grid crew tying the site into the medium-voltage line.
The transformer going onto its plinth beside the container.
The transformer going onto its plinth beside the container.
Pulling the power cables into the container — after dark.
Pulling the power cables into the container — after dark.
From the container roof: transformer, trench, perimeter wall.
From the container roof: transformer, trench, perimeter wall.
Inside the container — live loop
The container's cooling tower — live loop
4Years operatingFour years on the Paraguayan market — since before the last halving.
97%Uptime guaranteeWritten into the contract you sign.
100%Renewable powerHydroelectric grid. Zero carbon from electricity.
3 weeksChina to ParaguayTwo weeks shipping, one week customs. Then we rack it.

See also

Next step

Tell us how many machines.
We come back with real numbers.

Send us the model and quantity you are considering. We verify today's price in China, calculate your electricity tier and come back with a written offer — no obligation, no pressure.

Replies within one business day · English · Español · Português · Deutsch · Slovensky · Magyar · Türkçe · 中文 · Русский